Battery & Inverter Install
Batteries are split between the factory location and the front most storage bay. We used 2 separate battery banks because two inverters require 400amp of surge power each. Only way to safely do that is separate fused banks.
Lots of blue Victron Energy gear here, but it all has a purpose. This system is a bit unique, it recreates 240v split phase power all while balancing the loads on the inverter via the auto transformer.
What's better is this customer can still plug
into 30, 20 or even 15 amp and still have that full 240v 50 amp
experience. Each inverter can connect to a leg of power independently.


Rv Solar
The RiverStone Legacy came with factory 3 panel setup and wired into the system back behind walls we couldn't get to so we opted to leave it in place.
We installed 1200 watts of 200w Rich Solar (6) panels in a 3 parallel configuration each string into it's own 100 | 50 charger. This lets each charger optimize for it's own conditions. They could upgrade to 8 panels and run them in a 2s2p configuration without changing controllers for over paneling.
We had a great time installing this system, it took two of us 2.5 days total.
Upgraded!
We can have no better compliment than asking for an upgrade. We were invited back the following year to add even more solar! Bringing the total to 3200w of solar! Plenty to run an AC all summer.

Watch.
800ah Battery
8x100ah Battle Born Lithium
Inverter
2x Victron Multiplus 12/3000
Auto Transformer for Split phase Balancing
Solar Charger
2x Victron Smart Solar MPPT 100/50
3200w Solar
16x 200w Rich Solar 24v Solar Panels
Monitoring
Victron Cerbo GX & Touch 50 Display